Load Wheel Change on Friction-Driven Conveyor

There are four load wheels on each trolley. The load wheels sit on top of the load rail and are part of the supporting mechanism for the trolley/carrier assembly.


Contact Us

load wheel

Conveyor - Load Wheel

Load wheels can be changed even if the trolley is engaged in conveyor system – it's as simple as loosening a single bolt.
preventive conveyor maintenance

Conveyor Maintenance

Our chainless overhead friction-driven conveyor requires minimal maintenance, including preventive maintenance.
belt installation

Conveyor - Belt Install

Drive belt installation is quick and efficient. Complete belt replacement can be done in minutes, after hours or during breaks.
belt change

Conveyor - Belt Change

Drive belts should be checked every 6 months. Old belts can be slipped or cut off and new installed during breaks or after-hours.

Load Wheel Change Basic Instrustions

Each load wheel is connected by a common shaft that is threaded on each end.

Simply remove the socket head cap head screw that holds the wheel in place.

Remove the wheel and replace it with the new one.

Tighten the cap head screw and maintenance is complete.

Google+ Blog LinkedIn Vimeo YouTube Twitter Facebook
Join our email list Subscribe

Industry Partners

Kasa Controls and Automation Midwest Finishing Systems IntelliTrack